Skip to main content
Home
Menu
  • Your Coop
    • About Us
    • Cooperative Governance
    • Employees
    • Job Openings
    • Touchstone Energy Cooperatives
    • Annual Meeting
  • Your Account
    • Apply for Service
    • Billing FAQ
    • Capital Credits
    • Energy Assistance
    • Rate Schedule
  • Member Programs
    • Rebates & Incentives
    • Renewable Energy Credit (REC) Program
    • Operation Round-Up
    • Power Supply Tour
    • Youth Programs & Scholarships
    • Co-op Connections Savings
  • Products & Services
    • Complete Home Surge Protection
    • Electrical Wiring Service
    • Generac
    • Security Lights
    • Sense Home Energy Monitor
    • Water Heaters
  • Safety
    • Safety Quiz
    • Grain Bin Clearance
    • Power Line Safety
    • Tree Planting
    • Underground Facilities
  • Energy Expertise
    • Touchstone Energy Savings
    • Energy Audit
    • Electric Vehicles
    • Load Management
    • Solar Energy
  • News

Grain Bin Clearance

You are here

  1. Safety
  2. Grain Bin Clearance

Whether you're purchasing a new grain bin or remodeling areas that contain existing ones, proximity to overhead power lines must be considered.

Safe Clearance

The National Electrical Safety Code requires

  • 18 ft minimum vertical clearance from the highest point of the filling port to overhead high-voltage wires, and

  • 55 ft minimum horizontal distance from the power line to the grain bin wall

Changes to landscaping and drainage work can affect clearance heights of power lines, so check these measurements regularly.

Filling Grain Bins

High voltage power lines are not insulated, so it's important to maintain an adequate high-wire clearance when using a portable auger, conveyor or elevator to fill your grain bin.

Moving Equipment near Grain Bins

When moving equipment, be aware of nearby power lines. Remember to maintain a 10 ft clearance to ensure safety.

If you are considering a plan for a new grain bin or reconstruction of an existing bin's site, please contact us, and let us assist you in maintaining a safe environment.

Grain Bin SafetyGrain Bin Safety 2

 

Back to Top

Quick Links

  • Contact Us
  • News
  • Statement of Nondiscrimination

Contact Info

Union County Electric Cooperative
32708 477th Ave
Elk Point, SD 57025

Office: 605-356-3395
Fax: 605-356-3397

About Us

Union County Electric Cooperative exists to provide high value energy to our Members by focusing on delivering safe, reliable, environmentally friendly electricity while promoting energy efficiency through education.

 

Follow Us Online

©2025 Union County Electric Cooperative. Your Local Touchstone Electric Cooperative.

  • Your Coop
    • About Us
    • Cooperative Governance
    • Employees
    • Job Openings
    • Touchstone Energy Cooperatives
    • Annual Meeting
  • Your Account
    • Apply for Service
    • Billing FAQ
    • Capital Credits
    • Energy Assistance
    • Rate Schedule
  • Member Programs
    • Rebates & Incentives
    • Renewable Energy Credit (REC) Program
    • Operation Round-Up
    • Power Supply Tour
    • Youth Programs & Scholarships
    • Co-op Connections Savings
  • Products & Services
    • Complete Home Surge Protection
    • Electrical Wiring Service
    • Generac
    • Security Lights
    • Sense Home Energy Monitor
    • Water Heaters
  • Safety
    • Safety Quiz
    • Grain Bin Clearance
    • Power Line Safety
    • Tree Planting
    • Underground Facilities
  • Energy Expertise
    • Touchstone Energy Savings
    • Energy Audit
    • Electric Vehicles
    • Load Management
    • Solar Energy
  • News